Your brand on the housing. Our name on the certificate.
Three routes into a private-label oximeter: rebrand our stock platform, modify it, or develop from a blank sheet. Most partners start with the first and move to the second by year two.
Pick the depth of customisation you actually need.
Custom tooling is expensive and slow. Most brands do not need it in year one — they need their logo on a device that already clears customs. We will tell you honestly which route fits your volume.
Private label
Logo, housing colour, retail box, IFU and accessories on our stock platform. Fastest route to market, no tooling.
Platform ODM
Firmware defaults, display modes, alarm behaviour, boot logo, app skin and a custom accessory kit on existing hardware.
Full development
New housing tooling, sensor geometry and a certification strategy built around your market and price point.
What changes, at what volume, and how long it takes.
Every line item below has been run through production at least twice. Lead times are in addition to standard production unless stated.
| Item | Options | MOQ | Lead time |
|---|---|---|---|
| Housing colour | Stock colours or Pantone-matched two-shot | 500 units | +10–14 days (tooling, one-off) |
| Logo | Laser etch on housing, print on screen bezel | 300 units | Included in standard lead time |
| Retail packaging | Printed box, blister, gift box, sleeve, hang tag | 1,000 units | +7–10 days |
| IFU & labels | Translation and layout in your brand template | 1,000 units | +5 days |
| Firmware defaults | Boot logo, default display mode, alarm limits, auto-off | 2,000 units | +15 days (re-validation) |
| Companion app | Icon, theme, onboarding, report branding (OX-900) | 500 units | +10–15 days |
| Accessories | Lanyard, pouch, batteries, carry case, probe branding | 1,000 units | +10 days |
| New housing tooling | Full ODM, new industrial design | 10,000 units | 16–20 weeks |
| Certification support | Technical file adaptation, local agent coordination | Quoted per market | Per market |
Packaging that survives the channel, not just the courier.
A box that looks right in a render can fail on a pegboard or in a fulfilment centre. We build to the channel: pharmacy shelf, Amazon FBA, or a distributor's own carton standard.
- Dielines and a physical white sample before tooling
- ISTA 1A drop-test certification on the packed carton
- FNSKU labelling, poly-bag suffocation warnings and FBA carton limits
- Barcode and GS1 verification, including country of origin marking
- Retail-ready master cartons with your SKU on the outside
Drop-tested packed cartons
Labels, bags and carton limits handled
Barcode verification before print
Packaging proof turnaround
An app with your name on it, under your developer account.
The OX-900 ships with a companion app we build and you publish. Your icon, your onboarding, your privacy policy — and your customer relationship, not ours.
- 01Icon, splash and themeiOS + Android
- 02Onboarding screensUp to 4
- 03PDF report brandingLogo + disclaimer
- 04Data destinationOn-device or your API
- 05Store submissionBuild + copy supplied
Six checkpoints, one project manager.
You get a named project manager for the whole programme — the same person from the first quote to the pre-shipment inspection photos.
NDA and brief
Market, volume, target price, certification requirements. We send the documentation pack under NDA the same day.
Model recommendation and landed cost
A written recommendation with FOB price, estimated duty, freight per unit and a compliance gap list for your market.
Samples and artwork
Stock samples in 3 days, branded samples in 7–10. Packaging dielines and a digital proof go out with the quote revision.
Deposit and tooling
30% deposit confirms the slot. Tooling, print plates and firmware changes are kicked off together, not sequentially.
Production and QC
100% functional and calibration test, AQL 1.0 sampling, pre-shipment inspection photos sent before the balance is due.
Shipment and documents
Booking, commercial invoice, packing list, certificate of origin, certificate of conformity and the lot test report.
Before you brief us.
You own any tooling you pay for, and it is held in your name. The technical file stays with FORTAI as the legal manufacturer unless we agree a full transfer, which requires a new declaration of conformity under your name and a notified body review.
Only if you hold the technical file and the regulatory responsibility for that market. For private label, the label carries your brand and FORTAI as manufacturer — the standard arrangement, and the one customs and notified bodies expect.
Yes, for defined markets and a committed annual volume, typically 12–24 months. Exclusivity is tied to a forecast, not a promise: we agree a minimum order schedule and review it each quarter.
We hold 12 months of cover on critical optical components and notify contracted partners six months ahead of any change. A component change triggers a design change note and, where the specification changes, fresh validation before shipping.
Send the brief. We will send the plan.
Volume, market, price point and launch date is enough to start. You will get a route recommendation and a costed timeline, not a catalogue.